Harperley Hall

 

The site at Harperley Hall was acquired by NPIA, the National Police Improvement Agency, and has undergone a major redevelopment. Part of the redevelopment includes a new residential and training centre (pictured here) a three storey curved building to reduce the visual impact within the Historical site.
 
The Fastbuild system had a tough design brief to meet. A tightly curved building meant that the panels had to deliver robustness and the acoustic performance required by the client under challenging circumstances.
The building incorporated the new fair faced panels which are ready for direct decoration, saving valuable time off the programme.

Structherm completed the build in just 14 weeks.
Project Name Harperley Hall
Client NPIA & Kier Northern
Location Durham
Sector Residential & Training Facilities
Building Type 3 storey curved building
Project Size 2243m2
Supply Package Walls, floors, stairs & roof structure
Build Time 14 weeks

Testimonial:

“This is the second time we have used Structherm, the latest system has shown significant developments in this period. We were particularly impressed with Structherm’s preparation of sample panels and willingness to discuss how required details and finishes could be achieved.”

Kier Northern
 

Featured Project

Ramada Encore, Barnsley - New Build

The 117 bed Ramada Hotel in Barnsley, was constructed in 12 ½ weeks, using Structherm’s Fastbuild® precast concrete system.