Gallowhill

 

External Wall Insulation used in Social Housing refurbishment project in Paisley, Renfrewshire

Project Background:
Renfrewshire Council is going through a programme of upgrading its Social Housing helping to bring them up to Scottish Quality Housing Standards by 2015.

Within their stock they had two Wimpey No-Fines concrete high rise blocks which were found to have structurally sound concrete frames but failing infill concrete. The buildings also had extremely poor thermal performance resulting in high fuel bills for residents, pushing them into fuel poverty. Due to the variable nature of no fines concrete these property types are not suitable for standard insulation fasteners given the high wind loads experienced on high rise residential blocks.

Client Requirements:
Renfrewshire Council wanted to transform the blocks and so invested £6 million into a refurbishment programme which included external works that would:

• Solve the structural problems associated with the failing infill concrete

• Improve thermal performance and therefore cut fuel bills

• Improve the external appearance of the buildings

Design Solution:
Structherm’s unique Structural External Wall Insulation (SEWI) system was specified for the external refurbishment of the building as it was able to offer solutions to each of Renfrewshire Councils requirements.

The SEWI system is based on the performance of a unique, lightweight stainless steel wire space frame with a 100mm Phenolic insulation core. The vertical panel spanning method was used to provide a rigid, continuous envelope around the upper floors of the building.

To complete the system a 14-16mm layer of fibre reinforced basecoat followed by an 8-10mm levelling coat and then a contemporary high performance Silicone finish was applied in a striking design using white and blue render. This finished layer provided the buildings with an attractive façade that fully met the client’s aesthetic expectations.

Results:
• The SEWI has stabilised the failing infill concrete and anchored back areas of loose material.

• Thermal performance has improved greatly with the U value of the walls dropping from 1.46W/m2K to 0.20W/m2K.

• The carbon footprint has reduced as it now requires less fuel to heat each flat to a comfortable temperature.

• The fresh, contemporary design of the buildings along with enclosed balconies, new windows and entrance upgrades has transformed the appearance of the blocks into modern and attractive buildings.
Project Name: Glencairn Court & Gallowhill Court
Location: Paisley, Renfrewshire
Sector: Social Housing - High Rise
Client: Renfrewshire Council
Building Type: Wimpey No-fines Concrete
Project Size: 2 Blocks 6,000m2
Product: • Structural External Wall Insulation
• Render Finish

 

Featured Project

Wauchope and Greendykes

The City of Edinburgh Council has numerous high rise blocks built in the 1960’s and 70’s, two of these blocks were Wauchope House and Greendykes House. Construction of both blocks was carried out by Cruden Ltd in 1966 and contain 86 flats each over 15 storeys.

News

John McPake – Technical Sales Manager - Scotland

Leading construction specialists Structherm have employed a new Technical Sales Manager for Scotland, who will be travelling across the country to meet new customers.