Project Background:

Rhondda Cynon Taff (RCT) Homes was formed in 2007 and is currently undertaking the largest home improvement programme Wales has ever seen. Around £170 million is being invested in homes and communities in Rhondda Cynon Taff over a five year period – and around £750 million over the next 30 years – to bring more than 10,000 homes up to Welsh Housing Quality Standard.

As part of the investment programme RCT is externally refurbishing many properties. This includes 10 non-traditional Arcal type properties in Aberdare, South Wales which have a long list of defects as follows:
  • Severe corrosion of stanchion bases
  • Cracking and spalling render
  • Rain penetration and rot in cladding panels
  • Missing or poorly fixed asbestos cement sheet cladding
  • Deterioration of protective coatings

Client Requirements:

RCT wanted a cost effective solution for externally refurbishing the Arcal properties and one that would:
  • Solve the structural problems associated with the corrosion
  • Create a watertight and thermally efficient building envelope
  • Reduce CO2 emissions and lower residents’ fuel consumption
  • Improve the external appearance of the houses
Design Solution:

Structherm’s unique Structural Insulated Cladding system incorporating 80mm thick Extruded Polystyrene insulation was specified for the external refurbishment of the properties as it can be installed over the original cladding. Steel repairs were carried out to the corroded stanchion bases. To complete the system a two tone dash finish was applied to significantly improve the appearance of the properties.
  
Project Name: Pentwyn Court
Location: Aberdare, South Wales
Client: Rhondda Cynon Taff (RCT) Homes
Sector: Social Housing - Low Rise
Building Type: Arcal
Project Size: 10 Properties
730m2
Product: Structural Insulated Cladding & render finish
Results:

  • The Structural Insulated Cladding and steel repairs have made the properties structurally sound and watertight.
  • Thermal performance has improved greatly with the U value dropping from 1.75W/m2K to 0.29W/m2K.
  • The carbon footprint of each house has reduced by virtue of requiring less fuel to heat them to a comfortable temperature. This will have the positive benefit of reducing fuel consumption for residents.
  • The aesthetic appearance of the properties has greatly improved as the refurbishment programme also included new windows, doors, roofs, soffits, fascia boards and guttering.
 

Featured Project

Glencairn Court & Gallowhill Court

Renfrewshire Council is going through a programme of upgrading its Social Housing helping to bring them up to Scottish Quality Housing Standards by 2015. Within their stock they had two Wimpey No-Fines concrete high rise blocks which were found to have structurally sound concrete frames but...

News

Structherm have made another significant step forward in a £2.4m contract in Durham

Always at the forefront in the development of external wall insulation, Structherm have made another significant step forward in a £2.4m contract in Durham.