Hotels
Structherm’s experience in the hotel and leisure sector extends from new build to external refurbishment and new build cladding.
The market demands flexibility and artistic influence which Structherm’s systems can easily incorporate. The Fastbuild system utilises pre engineered pre cast concrete panels which provide rapid erection times and can be designed to be Direct Decoration ready whereby they are of sufficiently high quality to accept direct decoration without the need for plastering or dry lining. This reduces costs and speeds up the programme time as the need for follow-on wet trades is removed.