The Project:

Built on land previously used as a playing field, Cranfield University’s new sports facility is an excellent example of how Structherm’s NSC1 system can be used to create a modern and contemporary looking building.

Project Solution:
The building frame was constructed using a hot rolled structural steel frame with cold rolled steel infill studding.  Cement particle sheathing boards with 70mm thick polystyrene were then fixed to the steel frame.

The building’s striking white finish was achieved using Flesscoat Cortina white acrylic render.

Challenges:
Despite the large areas involved the modern and clean look was achieved rendering a complete elevation in a single day.  The NSC1 system provides a seamless finish as it requires no movement joints.

Results:
On completion of the project, all those involved were very pleased with the outcome and commended both Structherm and the AIC on their professional manner and would be confident to recommend Structherm to other organisations.
Project Name: Cranfield University Sports Hall
Location: Cranfield, Bedfordshire
Sector: Education
Client: Cranfield University
Building Type: New Build Large Single Storey Sports Facility
Project Size: 1700m2
Product: External Wall Insulation

 

Featured Project

Beechwood School - New Build

Completed in 2007, Beechwood School was part of a £44 million, grouped PFI project which involved three schools, community facilities and a residential unit for autistic children.

News

Structherm have made another significant step forward in a £2.4m contract in Durham

Always at the forefront in the development of external wall insulation, Structherm have made another significant step forward in a £2.4m contract in Durham.