Structherm have released a new case study detailing their work on Phase 2 of the Wrexham Airey project.

The project covered the refurbishment of 59 Airey properties for Wrexham County Borough Council and was installed by Thomas Holdings Limited.

Airey houses were only designed to have a lifespan of maximum twenty years so consequently many of them have exceeded this expectation. Airey properties are designated ”defective” by the Building Research Establishment (BRE).

This project really shows the capabilities and versatility of the Structherm system. Working with the client and contractor, both render and brick slip finishes were used to modernise the look of these 20th Century homes.

The case study is available now, and you can read and download it here.