ThermaBase Structherm have developed an innovative below DPC (damp proof course) insulation that is pre-finished and can be adhesively fixed in place. This enables a more time and cost effective installation process over traditional methods ThermaBase Typical detail...
Barks Drive Crosswall Pilot, Stoke Project Background:In 2019, Structherm worked with Westdale North to refurbish 7 homes in Stoke. The buildings included in the work were of crosswall construction. Crosswall properties present their own refurbishment challenges. The...
Shieldhill, Falkirk Project Background: From October 2017 to September 2018 Structherm Limited’s unique Structural External Wall Insulation System (SEWI) was installed by one of their Specialist Approved Installers, Ailsa Building Contractors Ltd. on 38 Weir timber...
Treuddyn Enveloping Scheme Project Background: In 2018, Structherm were approached to work on the Treuddyn enveloping scheme for Flintshire County Council. Several issues needed to be addressed with the refurbishment. The existing cavity wall ties of the properties...